Model | Feed size(mm) | Capacity(t/h) | Power(kw) | Vibratory frequency (hz) | Double-amplitude (mm) | Exciting force (kn) |
Weight(kg) |
ZG-25 | 50 | 25 | 2*0.4 | 25 | 2-3 | 2*5 | 174 |
ZG-60 | 70 | 60 | 2*0.75 | 25 | 2-4 | 2*8 | 242 |
ZG-80 | 80 | 80 | 2*0.75 | 25 | 2-4 | 2*8 | 258 |
ZG-100 | 100 | 100 | 2*0.74 | 16 | 2-5 | 2*10 | 321 |
ZG-200 | 150 | 200 | 2*0.75 | 25 | 2-5 | 2*16 | 372 |
ZG-300 | 150 | 300 | 2*0.75 | 25 | 3-6 | 2*16 | 556 |
ZG-400 | 180 | 400 | 2*2.0 | 16 | 3-5 | 2*20 | 606 |
ZG-500 | 500 | 500 | 2*2.5 | 25 | 3-5 | 2*30 | 886 |
NO. | down phenomena | Reason of shut down. | Solutions |
1 | The feeder does not start after the power supply is connected. | 1.Circuit impassability. 2.The motor is out of order. 3. The load is too heavy. 4. In a row with other devices. |
1. Check whether the three-phase power supply is broken. Check whether voltage is consistent with Signs. 2.Open the motor bracket and solve the jam phenomenon. 3. Start with light load. 4.eliminateconnection with other equipment. |
2 | The amplitude of vibrating feeder is small. Transverse swingand deviate material. |
|
1. Change a vibration motor wiring, make the two vibrating motors reverse operation. 2. One of the vibration motor is damage and it should be changed rapidly. |
3 | Vibration motor temperature is too high. | 1. Bearing hot. 2. The motor runs following one operation. 3. The rotor chamber |
|
4 | Current increases. |
|
1. Repair motor and electricalwiring. 2. Reduce material thickness. 3. Add grease. |
5 | Large noise. | Vibration motor base bolt looseness or breakage. | Bolts shall be tightened or replacement. |